Completed Projects




D-South Floodwall Phase III
Removal of Concrete Armoring, Extension of Steel Shet Pile Wall, Earthen fill to +18', Replacement of Concrete Armoring
Engineer: GIS Engineering
Contractor: Sealevel Construction



Section F Berm Improvements
Elevation of protected-side levee berm from 5' below sea level up to sea level. Section runs on east side of south Lafourche from Delta Farms to E 29th St.
Engineer: Angelette Design
Contractor: Sealevel Construction




Breton Canal Weir
Installation of variable-crest weir at intersection of Breton Canal & Bayou Lafourche near South Lafourche High School to control water levels in Bayou
Engineer: GIS Engineering
Contractor: Wolf Construction Group



C-South Levee Improvements
Elevation of levee to +18' from the Cote Blanche Connection to W 107th St.
Engineer: Angelette Design
Contractor: GIS Construction




D-North Levee Improvement
Elevation of levee to +16' near Leonard J. Miller, Jr. Airport. Area was slightly overtopped during Hurricane Ida.
Engineer: Picciola & Associates
Contractor: Outer Limits Contractors




E-North Levee Improvements
Elevation of levee to +16' behind E 44th St. Area was overtopped during Hurricane Ida.
Engineer: Picciola & Associates
Contractor: GIS Construction




Golden Meadow Lock & Pipeline Floodwall Repairs
Repair of scouring around floodwalls in Golden Meadow from Hurricane Ida. Tie-ins were armored with concrete mats after repair.
Engineer: Picciola & Associates
Contractors: Circle, Construction



Larose Floodwall Vessel Impact Barrier
Installation of timber pile clusters along the floodwall on the south bank of the GIWW in Larose to protect the wall from vessel and barge impacts.
Engineer: Angelette Design
Contractors: Low Land Construction